As renewable energy expands across Japan, demand for grid-scale battery storage keeps growing. Yet revenue depends heavily on the quality of operation — which market to bid into, when, and at what price.
Grid-scale battery interconnection-study applications nationwide (as of end of December 2025) — and applications keep surging every year
Source: METI Next-Generation Power Grid Working Group materialsDaily price spread in the spot market (2024 nationwide average level). Capturing it takes highly accurate price forecasting
Source: JEPX published trading resultsBalancing-market reform: relying on a single market no longer pays — switching between markets is the key to revenue
Source: OCCTOVolatile prices, complex regulations, unpredictable weather. TerraSignal's two products turn the noise of the power market into a reliable revenue signal — with AI forecasting and mathematical optimization.
End-to-end management of your battery storage business.
Site Exploration
Document Preparation (Form 5-6, etc.)
Permit Process Management
Coming SoonBattery Operation
Site Exploration
Document Preparation (Form 5-6, etc.)
Permit Process Management
Battery Operation
Zero upfront costs and zero fixed monthly fees. Fees can be verified on your dashboard every month.
The AI's reasoning is shown on the dashboard in plain language. No black-box anxiety.
From site evaluation to grid-connection application forms (5-6, 5-7) — AI turns weeks of work into seconds.
[Release] Grid Battery Automatic Operation Platform "TerraSignal" iOS App Now Available on the App Store
Completion of Factory Acceptance Test (FAT) for Shizuoka Prefecture Kakegawa City Project and Verification of Integration with Operation Optimization System "TerraSignal Run"
Announcement of Basic Agreement on Strategic Partnership for the Promotion of Next-Generation Energy Storage System (ESS) BusinessFrom first conversation to live operation in four steps. No upfront or fixed costs.
We ask about your site location, battery and PCS specifications, warranty terms, and your contract status with an aggregation coordinator (AC).
We present a revenue estimate with every assumption stated. Once you are satisfied, we sign electronically.
We set up your dedicated dashboard, configure the operating policy together — charge/discharge limits and risk tolerance — and generate a trial bidding plan for your review.
Operation begins on a fully performance-based fee (10% of gross profit). You can verify results on your dashboard anytime.
This flow is for owners of a battery already in operation. If you're still at the land-development stage, see the TerraSignal Plan onboarding flow instead.
No. Our fee is purely performance-based (10% of gross profit), with no upfront or fixed monthly cost. If there is no revenue, we receive nothing. We are paid only when you profit — a fee structure that aligns our interests with yours.
For other questions, please reach out via Contact.See the full FAQ for more details.